Step-by-Step Execution
The Installation Workflow
A methodical approach to evaluating, sizing, and mounting on-demand water heating systems.
1. Assessment & Sizing
Evaluating peak groundwater temperature in Warminster, PA, simultaneous fixture demand, and gas supply capacity to determine the ideal unit.
2. Removal & Prep
Safely draining and removing existing storage tanks, preparing wall anchoring points, and modifying gas, water, and electrical connections.
3. Venting & Mounting
Securing the unit to the wall, installing specialized direct-vent pipework through sidewalls, and connecting gas supply lines with sediment traps.
4. Testing & Commissioning
Flushing lines, checking for gas leaks, calibrating water temperature settings, and verifying optimal burner ignition and flow rates.